A few years ago a new roll of belt was standing in the yard of an arable farm out on the plains, and the manager was proud of the price. Bought by the metre, ordered cheap, cut to width down to the millimetre. What nobody read was the marking on the inside. The new belt had a thinner carrying-side cover than the old one, and after a single summer it was worn through where the old belt had lasted three years. The cheap metre turned out to be the expensive one.

In short: Buying a replacement conveyor belt is about more than the price per metre. The three questions that actually save money are these: cut-to-length or fabricated, which marking has to go on the order, and how the heavy roll gets to you and into storage. The type designation on the belt is not decoration, it is your order. And with belt by the metre, the risk of the splice travels to you along with the open ends.
A roll of belt on the pallet: what sounds cheap by the metre arrives as heavy, awkward freight.
A roll of belt on the pallet: what sounds cheap by the metre arrives as heavy, awkward freight.

The cheap metre that turned expensive

The mistake at that farm was not the low price. The mistake was that nobody checked what was actually coming off the roll. A belt does not become expensive because it costs a lot to buy. It becomes expensive when it has to come off again too soon.

Cost a belt purchase honestly and there is more on the bill than the price per metre: the belt itself, the fitting and the splice at the ends, every repair to that seam over its life, and the production you lose while it is being repaired. The price is what you pay. The cost is what you end up spending.

One belt manufacturer puts the gap at four to five times the service life between quality goods and a bargain belt. That is a manufacturer’s figure and not a standard, but the direction matches what you see out in the field: a cover one grade better suited to the material can save a whole replacement cycle. A replacement saved is not just a belt saved. It saves the downtime along with it, and the downtime is usually the dearer item.

That is the thread running through this article. Save at the wrong end of a belt and you pay for it at the transfer point. And nearly every one of those false economies can be headed off at the order stage, once you know what matters.

Cut-to-length or fabricated: what you are really buying

Conveyor belt comes in two basic forms, and the choice decides how much work and risk stays with you. Belt by the metre is belt off the roll, cut to the length you want and often to the width you want, with open ends. A fabricated belt is joined endless and ready to run, made to size and delivered fit for service, on request already fitted with cleats, guide profiles or sidewalls.

Buying belt by the metre is a bit like buying cloth off the bolt. The metre is cheap, but you cut and hem it yourself. Hemming here means joining the two ends into an endless belt. If the goods are also slit lengthwise from a wider roll, the carcass lies open along that cut edge, where a full-rubber sealed edge would normally sit. Moisture wicks into the fabric through an open edge.

  By the metre Fabricated
Delivery form Off the roll, open ends Joined endless, made to size
Splice You join it, or have it joined Done at the works, to a defined splice quality
Add-ons (cleats, guides) Not included Fitted on request
Price Cheaper per metre Higher, but ready to run
Risk of the seam Sits with you Sits with the supplier
Best for Those who can do their own splicing and keep belt in stock Those who want the belt ready to fit

Which form pays off depends less on price than on your workshop. If you can splice cleanly yourself, or have a service firm on call, belt by the metre serves you well and you keep a length in stock. If you need the belt ready to run and do not want to answer for the splice, you buy fabricated and pay for that peace of mind. Both are right, just for different operations.

The marking is your order

Every proper belt says what it is. That designation is not printed for show, it is the specification you order by. Order by looks, that is by colour, thickness and feel, and you often order the wrong thing. Read the designation and you order what fitted last time. No serious manufacturer sells you a belt on colour alone, and no good dealer fails to ask for the building blocks below.

Take a typical designation like EP 400/3 4+2 Y apart. It looks like a number plate, and that is exactly how it reads, block by block.

Block Meaning
EP Carcass fabric: polyester lengthwise, polyamide across. This is the common textile belt.
400 Nominal breaking strength of the whole belt in newtons per millimetre of width, not per ply.
/3 Number of fabric plies, three here.
4+2 Cover thickness: 4 millimetres carrying-side cover on top, 2 millimetres pulley-side cover underneath.
Y Cover grade, here the standard class for normal service.

The number in the middle causes the most confusion. The 400 in an EP 400 is not the number of plies and not the thickness, it is the belt’s nominal breaking strength. Common textile belts come in steps such as EP 250, EP 400, EP 500, EP 630, EP 800 and higher, usually through more or stronger plies. For buying, one thing counts above all: know the old designation when you reorder and you save yourself the guesswork and the supplier a query. If the embossing is no longer legible on the old belt, a photo of an offcut often helps more than a long description.

Here we read the designation as an order: what do I order so the new belt matches the old one. What the individual fabrics and cover grades mean for behaviour in service, which compound lasts longer with which material, is a question of belt type and a chapter of its own.

The embossed designation on the belt underside is your order in miniature: fabric, breaking strength, plies, cover, abrasion grade.
The embossed designation on the belt underside is your order in miniature: fabric, breaking strength, plies, cover, abrasion grade.

The splice: the weakest point in the purchase

With belt by the metre you buy the belt, you do not buy the splice with it. The open ends are either hot-vulcanised, that is pressed under heat and pressure into a continuous, homogeneous seam, or joined mechanically with fasteners and clips. A vulcanised splice holds longer and tighter, but it takes longer and needs equipment. A mechanical one is quick and needs little tooling, but it is the more delicate solution as soon as tension and tightness come into play.

For the purchase, only one thing counts: the splice is the weakest point in the whole belt. A strong belt with a badly made seam is a weak belt. So anyone ordering belt by the metre should know beforehand who joins the ends and with what, not once the roll is already sitting in the yard. Which method is right when, how long a splice lasts and what it costs is a subject in its own right.

Weight and roll: what actually gets delivered

Say conveyor belt weight and most people think of the tonnage on the belt, not of the roll in the yard. Yet it is the roll weight that decides the logistics of the purchase. A conveyor belt is heavier than it looks. One millimetre of cover rubber weighs around 1.12 kilograms per square metre, so a cover package of 4 plus 2 millimetres already brings nearly 6.7 kilograms per square metre in rubber alone. On top comes the carcass at 4.2 to 5.5 kilograms per square metre depending on the construction.

For the total weight there is a usable rule of thumb: total thickness in millimetres, times width in metres, times length in metres, times 1.45, gives the weight in kilograms. A belt 800 millimetres wide, 100 metres long and 12 millimetres thick comes to around 1,400 kilograms that way. That is the roll that has to be delivered, unloaded, lifted and stored. It weighs about as much as a small car, except a small car has wheels.

A roll is soon wider and heavier than any workshop door would like. A heavy, awkward roll ties up a crane or forklift, floor space to manoeuvre in and a few strong pairs of hands. Work that out only on delivery day and you have a problem on delivery day. Settle beforehand how the roll comes off the lorry and how you move it to where it goes in. The right lifting gear is cheaper than a roll that sits in the way because nobody can lift it.

On the crane hook you see what the rule of thumb already told you: a roll soon weighs more than a tonne.
On the crane hook you see what the rule of thumb already told you: a roll soon weighs more than a tonne.

Storing without losing service life

Rubber ages even when the belt only sits on the rack and never runs a metre. Ozone and UV light keep working, and the compound turns more brittle with the months. A belt in the store is like a rubber band in a drawer. You never use it, and it still snaps one day at the first firm pull.

You store it best lying flat or hanging, free of tension, dry and out of the sun, at around 10 to 20 degrees. As a rule of thumb, keep the storage time to no more than six months, and under ideal conditions up to eighteen months. After that you are not fitting a fresh belt at all, you are fitting an aged one.

For the purchase this means: over-buying belt by the metre is not a saving but capital tied up with an expiry date. The roll you lay in as a reserve ages on the rack too, and the handsome spare may already be past its best by the time of the next fit but one. A little reserve is sensible. Half a warehouse of belt rarely is.

Stored right, the belt ages more slowly: cool, dry, dark and free of tension.
Stored right, the belt ages more slowly: cool, dry, dark and free of tension.

The mistakes that cost money

In the end, the expensive mistakes in buying belt come down to the same handful of patterns. They rarely cost anything at purchase. They cost later.

The first is buying by feel instead of by designation. Two belts can look the same and differ sharply in carcass, cover thickness and abrasion grade. Someone who does not know the old designation and reorders by looks soon buys the weaker goods, exactly as on that farm.

The second sits in the carrying-side cover. If the top cover is too thin for the material, it is worn through quickly, and then the carcass lies exposed. A belt with an open carcass runs on borrowed time: the fabric draws moisture, frays and comes apart ply by ply. Carrying-side cover thickness is no side issue, it is your real reserve of service life.

The third mistake sits in the pulley, not the belt. A thick, stiff carcass needs a big enough pulley to run around without damage. The seemingly stronger belt on too small a pulley gets over-bent, the plies separate, and it tears sooner than a properly chosen one. Stronger is simply not automatically more durable. Belt and pulley need to be thought of together, at the latest when you order a higher strength class than before.

The fourth is over-buying, which has already come up: too much belt by the metre in reserve ages on the rack; too little, or the wrong width, means a reorder, fresh freight and downtime until the right roll arrives. Both cost money, and both can be avoided with a clean order.

And the most expensive mistake is the one we started with: taking the price per metre for the whole truth. The price is on the invoice. The cost turns up a year later at the transfer point.

Key takeaways

  • When you buy conveyor belt, the form you buy in, the marking and the splice decide the cost, not the price per metre alone.
  • Belt by the metre is belt off the roll with open ends. You splice it yourself and carry the risk of the seam. A fabricated belt comes ready to run, at a higher price.
  • The type designation, for example EP 400/3 4+2 Y, is your order: fabric, breaking strength, plies, cover thickness, abrasion grade. Order by designation, not by looks.
  • The splice at the ends is the weakest point. Settle beforehand who makes it and with what.
  • Plan for weight: an 800 mm belt, 100 metres long and 12 millimetres thick, weighs around 1.4 tonnes. A crane, a forklift and storage space are part of the purchase.
  • Rubber ages in storage too. Do not over-buy for stock; keep it cool, dry and dark.

Frequently asked questions

What is the difference between belt by the metre and a fabricated belt?

Belt by the metre is belt off the roll, cut to the length you want and often to width, with open ends. You join the ends into an endless belt yourself and so carry the risk of the seam. A fabricated belt comes joined endless, made to size and ready to run, if needed, already fitted with cleats or guide profiles. Belt by the metre is cheaper per metre; a fabricated belt takes the splice, and its responsibility, off your hands.

How do I read a conveyor belt marking before buying?

Read the designation block by block. In EP 400/3 4+2 Y, EP stands for the carcass fabric of polyester and polyamide, the 400 for the nominal breaking strength in newtons per millimetre of width, the /3 for three fabric plies, 4+2 for 4 millimetres carrying-side and 2 millimetres pulley-side cover, and the Y for the cover grade in normal service. When you reorder, give the old designation if you can. If it is illegible, a photo of an offcut helps.

How heavy is a conveyor belt and what does that mean for delivery?

Heavier than many expect. One millimetre of cover rubber weighs around 1.12 kilograms per square metre, and the carcass comes on top. With the rule of thumb total thickness in millimetres times width in metres times length in metres times 1.45, a belt 800 millimetres wide, 100 metres long and 12 millimetres thick weighs around 1,400 kilograms. A roll like that needs a crane or forklift, room to manoeuvre and storage space. Settle the handling before you order, not on delivery day.

How long can I store a conveyor belt?

Rubber ages even unused, because ozone and UV light keep working. As a rule of thumb, keep the storage time to no more than six months, and up to eighteen months under ideal conditions. Store it lying flat or hanging, free of tension, dry, dark and at around 10 to 20 degrees. Too much belt by the metre in reserve is therefore capital tied up, ageing on the rack.

Why is the cheapest conveyor belt often the most expensive in the end?

Because the purchase price is only part of the cost. On top come fitting and the splice, repairs to the seam over its life and the production lost during the repair. One belt manufacturer puts the difference at four to five times the service life between quality and cheap goods; that is a manufacturer’s figure, not a standard. A suitable cover can save a whole replacement cycle, and with it the downtime that hangs on it.

So that the marking is right at your next belt purchase and chance does not get a vote: we are building a tool that puts the right specification together for you.

On the waitlist you will be among the first to hear, the moment it is ready.

Join the waitlist Estimate weight and length up front with the Conveyor Belt Calculator

← All articles